Thursday Willis put down the new plywood over the existing plywood subfloor. Saturday Amity Floors installed the new linoleum and Willis came and re-installed the toilet. I did some caulking and I painted the baseboard. The only thing left is to get the painter to repair the wall.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment